the republic logo

Final pontoons being built at Tacoma, Aberdeen for Highway 520 bridge on Lake Washington

bug
Share/Save/Bookmark

SEATTLE — The final eight pontoons being built at Tacoma for the new Highway 520 floating bridge are floating out of their casting basin this week.

The Seattle Daily Journal of Commerce reports (http://bit.ly/1vrIt4P ) only three larger pontoons remain to be built for the Lake Washington bridge. They are being constructed in Aberdeen and should be finished next spring.

The pontoons are towed to Seattle where crews are anchoring and linking the sections to form a six-lane bridge connecting with Bellevue.

The new bridge, scheduled to open in the spring of 2016, will be made up of 77 pontoons. Of those, 44 were built at Tacoma and 33 at Aberdeen.


Information from: Seattle Daily Journal of Commerce, http://www.djc.com/

Think your friends should see this? Share it with them!

Story copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Feedback, Corrections and Other Requests: AP welcomes feedback and comments from readers. Send an email to info@ap.org and it will be forwarded to the appropriate editor or reporter.


We also have more stories about:
(click the phrases to see a list)

Category:

Follow The Republic:

All content copyright ©2014 The Republic, a division of Home News Enterprises unless otherwise noted.
All rights reserved. Privacy policy.