the republic logo

Dredging underway on project to increase Mississippi River water flow into Bayou Lafourche.

bug
Share/Save/Bookmark

BELLE ROSE, Louisiana — Dredging is underway on a $16 million project that will ultimately increase Mississippi River water flow into Bayou Lafourche.

The Courier reports (http://bit.ly/1RsNcde) the second dredging phase of the massive Mississippi River Reintroduction to Bayou Lafourche project involves removing vegetation and dredging sediment and mud flats for 8.3 miles between Belle Rose and Napoleonville. Nearly 800,000 cubic yards of mud will be dredged.

The Mississippi River Reintroduction to Bayou Lafourche project also includes bridge modifications, new water-control structures, replacement of the Union Pacific Railroad Bridge and the removal of the weir, or small dam, in Thibodaux.

When completed, Freshwater District Executive Director Ben Malbrough says the freshwater flow should increase from 330 cubic feet per second to more than 1,000.


Information from: The Courier, http://www.houmatoday.com

Think your friends should see this? Share it with them!

Story copyright 2015 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Feedback, Corrections and Other Requests: AP welcomes feedback and comments from readers. Send an email to info@ap.org and it will be forwarded to the appropriate editor or reporter.


We also have more stories about:
(click the phrases to see a list)

Category:

Follow The Republic:

All content copyright ©2015 The Republic, a division of Home News Enterprises unless otherwise noted.
All rights reserved. Privacy policy.