the republic logo

Government contractor tearing down last of inactive facilities at Paducah plant

Share/Save/Bookmark

PADUCAH, Kentucky — Demolition is continuing on the last of 32 inactive facilities scheduled to be removed at the former nuclear enrichment facility in Paducah.

The C-410 complex is roughly the size of four football fields and was used from 1957 to 1977 to produce uranium hexaflouride and fluorine.

The Paducah Sun reports (http://bit.ly/1jZNKqE) demolition is scheduled to be completed this fall.

Operators are cutting steel and other debris into smaller pieces to be shipped in heavily lined and covered railcars to a commercial disposal site. In 2012 and 2013, workers used special equipment to treat nearly two miles of uranium hexafluoride piping to make it safe for removal at the site.

LATA Kentucky is the U.S. Department of Energy contractor handling the demolition.


Information from: The Paducah Sun, http://www.paducahsun.com

Think your friends should see this? Share it with them!

All comments are moderated before posting. Your email address must be verified with Disqus in order for your comment to appear.
View our commenting guidelines and FAQ's here.

Story copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Feedback, Corrections and Other Requests: AP welcomes feedback and comments from readers. Send an email to info@ap.org and it will be forwarded to the appropriate editor or reporter.


We also have more stories about:
(click the phrases to see a list)

Category:

Subjects:

Places:

 

Follow The Republic:

All content copyright ©2014 The Republic, a division of Home News Enterprises unless otherwise noted.
All rights reserved. Privacy policy.