the republic logo

The big crane is coming: Delivery of 400-foot mobile device begins at Vikings stadium site

Share/Save/Bookmark

MINNEAPOLIS — The Minnesota Vikings stadium construction site has an important delivery on the way.

Portions of a 400-foot mobile crane began arriving Monday, with a total of 70 truckloads schedule to drop off the sections over a 10-day period. The crane is needed to hoist the steel pieces forming the top of the roof that at its peak will be 300 feet high. The crane will move back and forth, once assembled, on tracks that stand more than 8 feet high.

There are already five fixed cranes on the site, ranging from 250 to 300 feet high.

Minnesota Sports Facilities Authority chairman Michelle Kelm-Helgen says 10 percent of the building has already been completed. The stadium is scheduled to open about two years from now.

Think your friends should see this? Share it with them!

All comments are moderated before posting. Your email address must be verified with Disqus in order for your comment to appear.
View our commenting guidelines and FAQ's here.

Story copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Feedback, Corrections and Other Requests: AP welcomes feedback and comments from readers. Send an email to info@ap.org and it will be forwarded to the appropriate editor or reporter.


We also have more stories about:
(click the phrases to see a list)

Category:

Follow The Republic:

All content copyright ©2014 The Republic, a division of Home News Enterprises unless otherwise noted.
All rights reserved. Privacy policy.