the republic logo

2nd stealthy destroyer starting to take shape at Maine shipyard

bug
Share/Save/Bookmark

BATH, Maine — The second of three stealthy destroyers under construction in Maine is starting to take shape.

The Navy says it has completed the hoisting of the 1,000-ton composite deckhouse onto the 610-foot hull of the future USS Michael Monsoor. It took four cranes to complete the job Friday.

Like the first-in-class Zumwalt, the Monsoor is a 610-foot-long destroyer that will be part of the first class of electric-drive surface combatants since the 1940s.

The Zumwalt's big price tag nearly caused the Navy to scuttle the program. Instead, it reduced the number of ships to just three, all of which are being built at Maine's Bath Iron Works.

Think your friends should see this? Share it with them!

Story copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Feedback, Corrections and Other Requests: AP welcomes feedback and comments from readers. Send an email to info@ap.org and it will be forwarded to the appropriate editor or reporter.


We also have more stories about:
(click the phrases to see a list)

Category:

Places:

 

Follow The Republic:

All content copyright ©2014 The Republic, a division of Home News Enterprises unless otherwise noted.
All rights reserved. Privacy policy.