INDOT maintenance crews will begin right-of-way mechanical brush cutting across the Southeast District in November to remove trees, shrubs and other vegetation along a number of state highways.
Mechanical brush removal utilizes specialized equipment such as a tractors with boom mowers and excavators with mulching heads. Operations are typically performed on shoulders with minimal traffic impacts. However, motorists should still use caution and watch for active crews throughout the district.
Specific routes where brush cutting is planned include U.S. 50, State Road 46, U.S. 31, U.S. 421, State Road 7, State Road 3, State Road 135, State Road 446 and State Road 250.
Brush cutting is completed to remove vegetation that is blocking line-of-sight or traffic signs, reduce asphalt deterioration due to trapped moisture and provide shoulder space for motorists.
Additional treatments for roadside management may include manual brush cutting for larger limbs or trees, in addition to mowing and litter pick-up.